Coming Soon


g2 Energy

To date, g2 Energy have successfully connected in excess of 133 MegaWatts (MW) of renewable energy to the grid, which includes several single 500kW Wind Turbines, large scale Solar farms and AD Plants.

If you are considering an embedded generation project, g2 Energy can help you. We have the capability to design and build your complete renewable energy project, from initial feasibility, through to planning, installation, project management and connection onto the grid. As a Lloyds registered ICP, g2 Energy may be able to provide you with a cost effective alternative to a quote you may have received from the local Distribution Network Operator (DNO).

Photos

Where to find us

g2 Energy


g2 Energy Limited,
Olney Office Park,
1 Osier Way,
Olney,
Buckinghamshire MK46 5FP


+44 1234 482482

Visit Website